UIT Alert: Multi-building Power Disruption
Current Status
Resolved - Multi-building Power Disruption
Affected Services
- UH Wired network
Event Updates
There was a power disruption to the following locations on UH Central campus today: Computing Center (596), CBB (499)- 5th floor, Conrad Hilton (590) - South side, MSM (520), and COM (506).
Network alarms at the Computing Center (596), CBB (499)- 5th floor, Conrad Hilton (590) - South side, MSM (520), and COM (506) have cleared.
Power Plant operator indicated that electricians' work this morning have impacted power to the buildings listed; details of electricians work is unavailable at this time.